Sunday, March 11, 2012
March 11th
Hadn't had a sleep-in in a while, so slept until 11am. Then started cleaning the grout, joined by Ryan who helped. Dad came over and painted the final room to be painted, including a tricky closet. Ryan and I went to HD and got stuff to repair the other broken stairs out back and he worked on that, I installed brackets for the new closet doors. Sold my tile saw and then went and bought a radiator and started cleaning it up. Went home to eat and then came back and sealed the sink (don't know why I never did that before). Worked on the trim over the counter by the fridge, as well as the window sill. Painted a lot of the quarter-round, installed the cove moulding, painted a shelf to go in the open cabinet area. Made a big long list of everything left to do. Also here is a pic of the outdoor spigot I installed the other day.